HYDROBIT RBE is a cold-applied, water-based, non-fibrated bituminous coating designed for reliable waterproofing and surface protection. It combines selected bitumen with special additives, creating an easy-to-apply emulsion that dries into a firm, seamless, and flexible membrane. HYDROBIT RBE is ideal for protecting concrete, asphalt, metal, roofing felt, and similar substrates. It is vapor permeable, allowing surfaces to breathe while offering excellent resistance to chloride penetration, mild acids, and alkalis. Solvent-free, asbestos-free, and easy to apply even on damp surfaces, it ensures durable protection without compromising on flexibility. Compatible with all bituminous products, it is perfect for general waterproofing needs.
Hydrobit RBE is a ready-to-use water based rubberized bitumen emulsion, normally applied in two coats by roller, brush, trowel or spray.
Summary of the method in the Hydrobit Rbe Technical Data Sheet. Always follow the full TDS on site.
| Standard | Title | Referenced for |
|---|---|---|
| ASTM D1187 | Standard Test Methods for Asphalt-Base Emulsions for Use as Protective Coatings for Metal | Listed in the TDS |
| ASTM D2939 | Standard Test Methods for Emulsified Bitumens Used as Protective Coatings | Listed in the TDS |
| ASTM C309 | Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete | Listed in the TDS |
| BS 8102 | Code of practice for protection of below ground structures against water ingress | Listed in the TDS |
Standards and test methods as referenced in the Hydrobit Rbe Technical Data Sheet. Values in the TDS are typical laboratory results under standard conditions.
Hydrobit RBE covers 3 to 5 m² per liter per coat. Two coats are recommended for roller or brush application.
Per the TDS, drying time is 4 hours at 35°C and over coating time is 14 hours at 35°C. Each coat must be completely dry before the next is applied.
The service temperature is -10°C to +85°C, and the application temperature is +5 to +55°C.
Yes, Hydrobit RBE may be applied to damp but not wet surfaces. On footings it can be applied to green concrete immediately after removing the shutter, where it also acts as a curing membrane.
Hydrobit RBE is available in 20 liter pails and 200 liter barrels, with a shelf life of 12 months from production in unopened original packing stored dry and away from direct sunlight.